Technical QA Standards

Quality Control & AQL 1.5 Protocol

Our quality assurance protocols follow strict international benchmarks: ANSI/ASQ Z1.4 (ISO 2859-1) Normal Sampling Level II, executed across four rigorous inspection gates.

Sampling Standard
ANSI/ASQ Z1.4
Inspection Level
Normal Level II
Critical Defects
0 Tolerance
Major / Minor AQL
AQL 1.5 / 4.0

Defect Classification Matrix

Defect CategoryAQL AcceptanceInspection Criteria & Examples
Critical0 (Zero Tolerance)Broken needle fragments, sharp metal hazard, mold/mildew, blood or chemical stains, missing mandatory legal/safety labeling.
MajorAQL 1.5Out-of-tolerance garment measurements (> POM allowance), open seams, hole/ladder in fabric, severe color shading, broken zipper/hardware.
MinorAQL 4.0Untrimmed threads > 1/2 inch, slight skip stitch within tolerance, minor removable dust mark, easily rectifiable packaging blemish.

The 4-Stage Factory Floor Audit Protocol

Quality control at StylexGlobal is not a post-production formality — it is an active, gate-controlled manufacturing discipline applied across four separate production phases:

  • Gate 1: Raw Material & Fabric Audit: 10-point / 4-point system fabric inspection on greige and dyed rolls before laying and cutting. Verification of fabric weight (GSM), yarn count, and lab-tested shrinkage.
  • Gate 2: Initial Production Check (IPC): First 50 finished pieces audited against approved golden PP sample. Verification of stitch density (SPI), seam tensions, and label placements.
  • Gate 3: During Production Check (DUPRO): Performed when 30–50% of the bulk order is stitched. Auditing sewing lines, measurement variance trends, and continuous 9-point needle calibration logs.
  • Gate 4: Final Random Inspection (FRI): Performed when 100% of order is produced and at least 80% is packed into master export cartons. Statistical sampling per ISO 2859-1 standards.

Direct Sourcing Inquiries

Connect with our Faisalabad merchandising desk for specs, factory audits, and quotations.